2024 Proposed Capital Project Details List:

Cohocton Campus Prekindergarten Building:

  • Replace select access controls

  • Upgrade floor sink and indirect waste connection

  • Replace unrated doors and provide air relief

  • Create Information Technology (IT) closet and reconstruct roof access

  • Replace gynmasium HVAC

  • Replace interior doors per safety and security audit

  • Provide security film on first floor windows

  • Create a new sensory room

  • Provide fire dampers in floor ducts (fire safety)

  • Repair roof drain leak

  • Replace electric water coolers

  • Replace cloth feeders to electric panels

  • Provide room restoration

  • Replace baseball infield mix

  • Replace site signage

Wayland Campus K-12 Building

  • Create single occupancy toilet rooms in high school locker rooms

  • Reconstruct ductwork in high school locker rooms

  • Provide Field House concessons

  • Replace High School chiller and boilers

  • Create a single occupancy toilet room at the Field House

  • Create storate and wellnes center at existing greenhouse

  • Provide new greenhouse

  • Renovate High School art roms,

  • Renovation to create expanded STEM (Science, Technology, Engineering and Math) program

  • Expand occupational and physical therapy suite

  • Renovate and expand Elementry School library

  • Replace unit ventilators

  • Renovate Elementary School locker rooms into single occupancy toilets and physical education office

  • Provide receiving addition for improved function and safety

  • Create code-required dedicated emergency generator room

  • Provide air conditioning in faculty room

  • Renovate and expand Elementary School cafeteria

  • PRoivde Elementary STEM (Science, Tchnology, Engineerng and Math) classroom

  • Replace cabinet unit heater

  • Rebuild stairs and ramp

  • Replace windows and repair lintels for improved safety and tempurature control

  • Replace detioriated sill flashing

  • Replace sidewalk at LGI entrance and other selected locations

  • Create an emergency access drive at back of Field House

  • Provide athletic field lighting (baseball/softball)

  • Resurface track

  • Provide baseball, softball and track parking

  • Replace six cross-corridor doors

  • Replace 15 interior doors per security and safety audit

  • Replace 16 exterior doors

  • Provide security film on first floor windows

  • Replace fin radiation enclosure (HVAC)

  • Insulate bare piping

  • Replace galvanized piping

  • Pipe lining on problematic storm piping

  • Replace electric water coolers

  • Replace 10 panelboards

  • Upgrade fire alarm panel for code

  • Replace paging sysem

  • Add data drops to classrooms

  • Update entrance cameras

  • Update access controls at selected entrances

  • Provide roof restoration

Transportiation Facilities:

  • Replace above ground fuel tanks

  • Replace fin radiation enclosure (HVAC)

  • Upgrade fire alarms and panel for code

  • Replace two fire-rated doors

  • Paint gas service

  • Provide carbon monoxide detection

  • Replace emergency eye wash/shower

  • Replace electric water cooler